Recent projects Stork Gears & Services

Gearbox inspection and test run for Kuwait oil company
Stork Optimization Services was invited by a Kuwaiti oil company for the complete inspection of a damaged vertical offset speed-increasing gearbox, type Rademakers. The aluminium gearbox frame had one bearing pocket that was badly worn out. The worst damage was caused by the output shaft coupling end bearing failure, which was completely destroyed.
Read moreRead more


Kuwait gearbox inspection
SGS
From gearbox inspection to sea-trails in Shanghai
Container vessel "MV Sinotrans Tokyo" was anchored at the port of Shanghai. It suffered from a major failure of the propulsion gearbox. InterOrient invited Stork Gears & Services to carry out visual inspections on board of the vessel. Inspections revealed that two teeth of the pinion had been broken out and the active flanks showed a repeated damage pattern.
Read moreRead more


Emergency gearbox repair
SGS
Gearbox refurbishment for sunken "Mighty Servant 3"
A tug was contracted to tow the sunken "Mighty Servant 3" from Cape Town to the Bahamas for repairs. Grand Bahama Shipyard Ltd. contracted Stork Gears & Services for refurbishment of the propulsion gearboxes, which were heavily damaged and rusted.
Read moreRead more


Emergency gearbox repair
SGS
Emergency repair of container vessel propulsion gearbox
Container vessel "Ara Felixstowe" was anchored in the port of Napels with severe gearbox damage, type RENK. Fast gearbox repair was extremely important in order to set sail in time with the fully loaded containers.
Read moreRead more


Emergency gearbox repair
SGS
Fast repair of propulsion gearbox after major breakdown
Our customer suffered from a major breakdown on the port gearbox. The casing had cracked and the internals were damaged. We could offer quick repair of the gearbox under DNV classification. This was both cheaper and faster than replacement of the gearbox.
Read moreRead more


Propulsion gearbox repair
SGS
The fastest turbine inspection for FPSO converter
During conversion of a tanker vessel to an FPSO, our customer asked Stork Gears & Services to perform an inspection on the cargo pump turbines. Inspection resulted in repair of the three turbines under DNV classification in the shortest possible timeframe, followed by on-site commissioning enabling the customer to stay on schedule.
Read moreRead more


Turbine inspection
SGS
Emergency gearbox repair at tugboat in Brazil
Stork Gears & Services was invited for an emergency repair of a propulsion gearbox in Brazil. The tugboat suffered from excessive vibrations that caused unforeseen machine failure. The main concern of our customer was how to fix the defects as soon as possible.
Read moreRead more


Tugboat gearbox repair
SGS
Inspection project at coal-fired power plant in Malaysia
Stork Gears & Services was invited for the inspection of ten coal mill gearboxes at a power plant in Malaysia. This plant is a large coal fired power station with generating capacity of 2400 MW. The project involved the complete inspection of ten gearboxes in order to determine their condition.
Read moreRead more


Inspection power plant
SGS
Complete inspection of a 55 MW load gearbox
Our Optimization department was hired for the complete inspection of a gas turbine driven generator set, including the gas turbine, the Graffenstaden load gearbox and generator.
With our multi-task services and power market specific expertise we were able to carry out the project within two weeks.
Read moreRead more & view photogallery


Tugboat overhaul
SGS

Overhaul of Husky tugboat

The DCV Balder is a Deepwater Construction Vessel operated by Heerema for deepwater field development up to 3,000 m waterdepth. Heerema Shipping contacted Stork Gears & Services for preventive maintenance of the Balders' tugbouat, called "Husky MV". The Balder had to set sail for Africa for a one year project, fast overhaul was necessary in order to set sail in time.
Read moreRead more & view photogallery


Tugboat overhaul
SGS

Shaft modification and bearing design for gasturbine »

The project involved the modification of the shafts and manufacturing of new bearings for a Westinghouse gasturbine with black start capability. Low oil pressure switched off the gasturbine of the power plant. Stork Gears & Services developed a new bearings concept, in a way that it is better suited to accommodate the stresses resulting from the application.
Read moreRead more

Westinghouse gasturbine
SGS

Custom built gearboxes for FiFi 1 tugboats »

Damen Ship Repair modified two tugboats for Fire Fight class 1. Stork Gears & Services was hired for the development of the gearboxes between the engine and the FiFi-pump. The engineering and fabrication is performed within 8 weeks.
Read moreRead more

wh105
SGS

Vibration measurements for gas turbines at K6P platform »

Stork Gears & Services was hired to record multi-channel vibration data at Total's K6P North Sea offshore platform. The project challenge was to determine why one of the critical gas turbines experienced starting problems..
Read moreRead more

wh105